News
Supplementary agreement to the contract between Gazprom Export and Gazprom Armenia was signed
The meeting participants discussed the state and prospects of bilateral cooperation, including natural gas supplies to Armenia in 2019.
Gazprom continues to build the LNG production, storage and shipment complex near the Portovaya compressor station
The approved financial plan will provide for a full coverage of the Company’s liabilities without a deficit
On December 18, 2018, within the closed session, Gazprom Export LLC successfully concluded the first gas sales deal on day-ahead basis.
The facility is now linked with the NCG market zone, which will add flexibility for its use.
With this document, the parties confirmed their interest in potential cooperation in the framework of the project.
Participants took stock of the IBC performance in 2018 and defined the strategic priorities for its future development
The Yamal gas production center has strategic importance, as it will assume the primary role in the national gas industry throughout the 21st century.
This is 2.6% more than within the same period of 2017
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Norbert Konkoly, Ambassador Extraordinary and Plenipotentiary of Hungary to the Russian Federation, took place.
The parties discussed the progress of the Nord Stream 2 and TurkStream projects.
It was noted that construction of the gas pipeline was proceeding as scheduled
A Gazprom delegation paid a working visit to Turkmenistan
Analytical Credit Rating Agency (ACRA) assigned to Gazprom Export LLC the highest creditworthiness rating AAA(RU) under the national scale for the Russian Federation with the Stable outlook.
According to preliminary data, in the period from January 1 through November 15, 2018, the Company delivered to that market 171.6 billion cubic meters of gas
Amid a favorable pricing environment in the Asian market as of 2018, U.S. LNG barely reached Europe, losing against Gazprom’s pipeline gas
Particular attention at the meeting was paid to future supplies of natural gas from Russia to China
The command to weld the final joint of the gas pipeline’s second string was given by Vladimir Putin and Recep Tayyip Erdogan
This is by 5.8 bcm (by 3.5%) more than within the period from January, 1 to November 15, 2017
It was noted that Germany had been consistently increasing natural gas purchases for the fourth year in a row
According to the document, gas deliveries to Austria will be increased by 1 billion cubic meters per year beyond the contractual amount for the entire contract period
This is 4.4% more than within the same period of 2017
The Gazprom Board of Directors commended the efforts of the Company to implement its major investment projects
It is 5.2%, or almost 8 bcm, more than within the period of January, 1 — October, 15, 2017
Gazprom Export is the first Gazprom's subsidiary to join a new form of tax control – tax monitoring - on January 1, 2019
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Rovnag Abdullayev, President of the State Oil Company of the Azerbaijan Republic, took place in St. Petersburg
Particular attention at the meeting was paid to the continuing construction of the Nord Stream 2 gas pipeline
Alexey Miller took part in a meeting with Gurbanguly Berdimuhamedov, President of Turkmenistan
Speech by Alexey Miller at plenary session at St. Petersburg International Gas Forum
The parties noted the strategic nature of their cooperation, discussing, among other things, the Amur Gas Processing Plant construction project
The parties paid special attention to the development of a joint project – the Katharina UGS facility.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Pekka Lundmark, President and CEO of Fortum, took place
Framework Agreement on the joint design concept (pre-FEED) for the Baltic LNG project is signed
The document envisages the creation of a Joint Coordinating Committee on collaboration in the natural gas sector, science and technology as well as staff training
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Joe M. Kang, President of the International Gas Union (IGU), took place on October 4 at the 8th St. Petersburg International Gas Forum
In 30 days, the rally participants travelled 9,881 kilometers across China, Kazakhstan and Russia
The signing ceremony took place in the presence of Vladimir Putin, President of the Russian Federation, and Sebastian Kurz, Federal Chancellor of Austria
The ceremonial finish of the Rally will take place within the 7th St. Petersburg International Gas Forum on October, 4th
The amount of Russian natural gas supply to Serbia increased by 41 per cent from 2014 to 2017
This is by 5.8%, or 8.2 bcm, more than in the period of January – September 2017
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Rainer Seele, Chairman of the Executive Board of OMV, took place on September 24 in St. Petersburg.
The participants of the world’s longest rally for LNG powered NGVs crossed the border between Kazakhstan and Russia on September 23.
Alexey Miller, Chairman of the Gazprom Management Committee, and Peter Szijjarto, Minister of Foreign Affairs and Trade of Hungary, held a working meeting in Moscow on September 17.
Alexey Miller, Chairman of the Gazprom Management Committee, and Han Zheng, Vice-Premier of the State Council of the People’s Republic of China, held a working meeting in Moscow on September 17.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Masami Iijima, Chairman of the Board of Directors of Mitsui & Co., Ltd., took place on September 12 at the 4th Eastern Economic Forum in Vladivostok.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Hidenori Takaoka, Chief Executive Officer of the Energy Business Group of Mitsubishi Corporation, took place on September 12 at the 4th Eastern Economic Forum in Vladivostok.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Seung-Il Cheong, President and Chief Executive Officer of KOGAS, took place on September 12 at the 4th Eastern Economic Forum in Vladivostok.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Wang Yilin, Chairman of the Board of Directors of CNPC, took place on September 12 at the 4th Eastern Economic Forum in Vladivostok.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Yoshihisa Suzuki, President and Chief Operating Officer of Itochu Corporation, took place on September 12 at the 4th Eastern Economic Forum in Vladivostok.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Tadashi Maeda, Governor of Japan Bank for International Cooperation (JBIC), took place on September 12 at the 4th Eastern Economic Forum in Vladivostok.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Nguyen Phu Trong, General Secretary of the Central Committee of the Communist Party of the Socialist Republic of Vietnam, took place in Moscow on September 7.
The event was held as a part of NGV rally from Rudong to St.Petersburg
The Solitaire vessel will perform these works using technologies that pay regard to ecological requirements
The rally participants will drive nearly ten thousand kilometers through China, Kazakhstan and Russia
Gazprom is entering its professional holiday with all projects going strictly as planned
The participants of NGV rally will drive nearly 10 thousand kilometers from Rudong to St. Petersburg
The platform is designed to physically sell natural gas to the European consumers, in addition to supplies under existing contracts
This is by 6.7 bcm more than in the same period of 2017
Before that, all permits necessary for construction of the pipeline have been granted by Germany, Finland and Sweden
Certain measures relating EU energy policy ruled non-correspondent to WTO standarts
Gazprom Export has signed a sponsorship agreement with FC Austria Wien
This is 6.4 bcm more than in the same period of 2017
The barge “Castoro 10” assumed its starting position to weld the pipes that will connect the landfall facilities of Nord Stream 2 with the new offshore pipeline.
Construction of a two-string crossing under the Amur River within the Power of Siberia gas pipeline is also in progress. Pipe pulling in the first tunnel was completed in July 2018.
In parallel, Pioneering Spirit is progressing since the offshore construction of the second line resumed on 26 June.
It is by 6 bcm more than in the same period of 2017
According to preliminary data, in the period from January 1 through July 12, 2018, gas exports to Serbia totaled 1.2 bcm, which is 5.3 per cent more than in the same period of 2017
The parties also considered the issues related to the purchases of Uzbek gas by Gazprom.
Particularly, Alexey Miller and Tran Sy Thanh considered the joint project of construction of a small-scale LNG production complex
The arbitrators have accepted Gazprom Export’s position
It is by 5.8% (5.5 bcm) more than in the same period of 2017.
Chairman of the Management Committee of Gazprom PJSC Alexey Miller stated that at the annual meeting of shareholders
According to this forecast, global gas demand will grow with average annual growth rates of 1.6% over the reviewed period.
A total of 1,161 kilometers (62 per cent of the overall gas pipeline length) of pipes has been laid along the two strings of the pipeline.
The buyer of the LNG cargo delivered to Japan by Energy Navigator tanker is Japan’s largest natural gas company Tokyo Gas
This is by 5 bcm more than within the same period of 2017
The award deprives Naftogas of reasons to attempt arresting Gazprom’s assets abroad.
Greenhouse gas emissions by Gazprom’s core businesses – the production, transportation, underground storage and processing facilities – are on the decline.
Pipe laying in the Swedish Exclusive Economic Zone is scheduled to start later this year.
The contract provides for supply of 2,9 million tons of LNG per year for 20 years and an additional three-year period of reaching a plateau.
The volume of supplied gas demonstrates a 5.8% increase over the same period of the record year of 2017.
Russia and Austria celebrate a half-century anniversary of partnership in natural gas
Fifty years ago, on June 1, 1968, the Soviet company Soyuznefteexport and Österreichische Mineralölverwaltung (OMV) signed an agreement for supplying natural gas from the USSR to Austria. In a mere three months, gas from Western Siberia reached the Baumgarten station.
The Company set 11 new records for daily exports to European countries. Specifically, 10 consecutive records were achieved in late February to early March 2018 during a cold snap in Europe.
Total sales for the three months of 2018 increased by RUB 323,030 million, or 18% compared to the same period of the prior year. Profit totalled RUB 371,623 million which is 11% more than for the same period of the prior year.
Minister of Mining and Energy of Serbia Alexandar Antić said that Serbia was ready to perform transit for that natural gas transportation route
The parties paid particular attention to the implementation of the Nord Stream 2 project
An additional study of the text of the arbitration decision has proven that a significant part of it had been written by a third person, not by the arbitrators.
The parties reviewed interactions between Gazprom and Moldovagaz in the framework of contracts for supplies and transit of Russian gas
The parties emphasized key role of gas in power generation in Luxembourg
As a follow-up to the Protocol, Gazprom and Botas inked an Agreement detailing the terms and conditions of the construction work.
The parties also discussed the prospects for the expansion of the regional gas infrastructure.
The meeting participants addressed joint efforts in the development of Uzbekistan's gas transportation infrastructure and underground gas storage in the country
Gazprom and Total contribute to the development of the Bolivian fuel and energy complex.
Gazprom, ENGIE and the Tsarskoe Selo Palace and Park Museum Preserve signed an Agreement to take part in the renovation of the Lyons Hall of the Catherine Palace
Gazprom, Uzbekneftegaz and the government of Uzbekistan signed a document on the continuation of gas production at the Shakhpakhty field until 2024
Gazprom and Shell signed the Agreement on the Baltic LNG project in furtherance of the Heads of the Joint Venture Agreement
Alexey Miller, Chairman of the Gazprom Management Committee, and Pascal De Buck, Chief Executive Officer of Fluxys reviewed the opportunities for the development of European gas transmission systems
The meeting participants expressed appreciation for the success of joint efforts within the active Nord Stream project.
The parties addressed status of the TurkStream and Poseidon projects as well
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Ulf Heitmueller, Chairman of the Executive Board of Verbundnetz Gas (VNG), took place today at the St. Petersburg International Economic Forum 2018.
According to preliminary data, from January 1 to May 23, 2018, Gazprom delivered to Austria 4.9 billion cubic meters of gas, an increase of 68 per cent from the same period of 2017.
The parties stressed the importance of building the Nord Stream 2 gas pipeline to provide long-term and reliable gas supplies to Europe
According to preliminary data, between January 1 and May 23, 2018, Gazprom delivered to Serbia about 1 billion cubic meters of gas, an increase of 5.8 per cent against the same period of 2017.
According to preliminary data, from January 1 through May 23, 2018, Gazprom supplied Germany with 24.4 billion cubic meters of gas, an increase of 13.4 per cent from the same period of 2017.
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Hemant Kanoria, Chairman of the Board of Directors of Srei, took place
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Tatsuo Yasunaga, President and CEO of Mitsui & Co., Ltd., took place today at the St. Petersburg International Economic Forum 2018.
Gazprom’s latest post-market test commitments proposal have been found acceptable
From January 1 through May 14, 2018, Gazprom delivered to Austria 4.7 bcm of gas, a 70% increase from the same period of last year.
It was noted that TurkStream was key to improving the reliability of gas exports to Europe.
Five dredgers are now working on the trench for the subsequent pipelaying in the Bay of Greifswald.
The deep-water pipelay for Line 1 of the TurkStream offshore gas pipeline has been completed at the Black Sea coast of Turkey. The pipelay of Line 2 will continue in Q3 2018.
It was noted that Gazprom provided reliable gas supplies to the Austrian market amid an increasingly strong demand for Russian gas over the past years.
The parties signed an Addendum to the Memorandum of Understanding aimed at widening the possible areas of cooperation.
Gas production and supply volumes continue to grow after the end of the winter period.
The contract provides for annual supplies of 600 million cubic meters of gas from January 1, 2018 to January 1, 2023.
The Finnish authorities issued a second permit for the pipeline construction and operation in the exclusive economic zone.
During a working meeting between Alexey Miller and OMV head Rainer Seele, the parties noted that Austria continues to show dynamic growth in demand after its record-breaking year for Russian gas consumption in 2017.
Another permit, required by the regional administration in accordance to the Water Act, is expected within the next weeks.
The meeting participants noted that European countries needed new and reliable routes for gas imports amid declining indigenous production.
The parties discussed the prospects of the Italian NGV market, as well as the efficiency of public support measures for converting vehicles to natural gas.
The company sets new absolute record of export deliveries at 19.6 bcm in March 2018.
The European Commission notes a significant increase in imports and consumption of “blue fuel” in its Quarterly Energy Report on European Gas Markets for Q4 2017.
Federal Maritime and Hydrographic Agency of Germany issues permit for laying the pipeline in the German Exclusive Economic Zone in accordance with the Federal Mining Act.
Environmental Impact Assessment submitted by Nord Stream 2 AG was awarded a “Good EIA Award” at the annual EIA Day held in Helsinki.
By March 20, European storages were filled at 20.5% on average. Some facilities are emptied by 94-96%.
Over 1,629 kilometers of the pipeline’s been biult by now. Construction of other export gas pipelines is also on schedule.
The parties discussed the state and prospects of bilateral cooperation.
Gazprom made a commitment to further reduce methane emissions from the Company’s facilities and encourage other market participants to do the same.
The parties discussed the state and prospects of strategic cooperation in the gas sector and within current joint projects.
Russian gas supplies to far abroad countries in March grew by 29.4% compared to last year.
Particular attention was paid to the relations between Gazprom and Naftogaz of Ukraine.
The bidding procedure resulted in a long term sale and purchase agreements signed with the largest global industrial gas companies.
Last weeks saw a record-breaking daily gas supply volumes, setting new historical maximums for Gazprom.
Currently, Gazprom implements the Energy Saving and Energy Efficiency Program for 2018–2020. The total savings in this period are expected to reach at least 6.57 million tons of fuel equivalent.
This February marks the 15th anniversary of the start of commercial supplies via the pipeline which conveys gas directly from Russia to Turkey across the Black Sea.
The parties discussed the ongoing and future cooperation in the gas sector, including the efforts to bring gas to various areas in Astana and the northeastern parts of Kazakhstan.
According to estimates, from January 1 through February 21, 2018, Gazprom delivered to Austria 1.8 bcm of gas, a rise of 60.6% against the same period of 2017.
The parties discussed the prospects for bilateral cooperation, including the potential for supplying LNG from the Gazprom Group’s portfolio to Pakistan.
In a quarter of a century, we have done a tremendous amount of work, in the results of which we can deservedly take pride.
The new business model sets up an Integrated International Marketing Division, which will be responsible for supplies, trading and marketing within the entire export portfolio.
The Investor Day attracted a wide range of portfolio managers and analysts from major global investment funds and credit institutions. Visitors were especially interested in the efforts taken by the Company to strengthen its foothold in foreign markets.
Stralsund Mining Authority issues planning approval to Nord Stream 2 AG for the construction and operation of the new pipeline.
The meeting addressed the status of LNG supplies to South Korea from the Sakhalin II project.
A permit received through diplomatic channels from the authorities of the Turkish Republic allows for the second string of the gas pipeline’s offshore section stretching to the Turkish coast.
According to the association, this initiative could potentially pose a threat to existing gas pipelines and new projects